HT Micron

Selected: Critical Manufacturing cmNavigo MES

Manufacturing context

Industry

Semiconductor manufacturing

Manufacturing type

Semiconductor packaging and testing

Country

Brazil

Starting point

Type

Greenfield plant

What was in place

HT Micron was bringing a new semiconductor facility into production and needed MES in place quickly enough to support qualification by major Tier 1 customers. During ramp-up, production involved paper, Excel, and manual processes.

What they needed

Reason for the MES decision

MES was required for customer qualification and to support traceability, routing, SPC, production control, and reporting as the new plant ramped.

Selection

Selected

Critical Manufacturing cmNavigo MES (Critical Manufacturing)

Why it was selected, according to the source

Important factors included implementation speed, ease of configuration, ability to support the Brazilian facility, and the long-term ability to keep the system maintainable and light.

Selection process

The team had more than 500 customer requirements, identified which requirements MES needed to meet, and sent those requirements to finalists for responses.

Other products considered

Three MES competitors reached the narrowed field. The two products not selected are not named in the source.

Integration and operational requirements

Quality

SPC was included in the initial scope.

Traceability and genealogy

Traceability and enforced routing were included in the initial scope.

Implementation

Rollout

The implementation was phased. Initial deployment focused on core MES needs. Later phases were intended to expand capabilities such as automation and maintenance.

Duration

Software implementation occurred during October and November 2014. Test lots and employee training occurred in December, and production was being tracked in MES from January 1, 2015.